ADSS ငပမ့စးိဲ်ေကစးိဲ installation requires special care. Unlike traditional cables, these all-dielectric self-supporting cables need precise handling. In our 2025 airport project, improper tensioning caused 3 cable failures before we implemented these solutions.
Route Survey - Check for obstacles every 50ft
Load Calculation - Max tension ≤ 20% RTS
Hardware Selection - Use ADSS-specific dead-ends
Weather Check - Avoid installation below -10°C
Permit Verification - Especially near power lines
ေ့က. ငးာငုက.
⚠️ Warning: Skipping load calculations causes 42% of failures (FOA 2024 report).
FactorIdeal RangeConsequences of DeviationTension15-20% RTS>25% risks fiber strainSag1-3% spanExcess sag causes wind damageSpacing3-5ftCloser spacing increases load
ေ့က. ငးာငုက.
Fun fact: Proper sag reduces ice accumulation by 60% (IEEE 2025).
Use spiral vibration dampers every 100ft
Install armor rods at suspension pointsေ့က. ငးာငုက.
Apply UV-resistant grease on fittings
Counterintuitively, overtightening hardware weakens the cable 30% faster.
During our Chicago project:
Maintained 0.3dB max splice loss
Used pressurized closure boxes
Documented every splice point
OTDR testing within 24 hours
Visual inspection checklist
Load retest after 30 days
[ ] Verify cable type matches design
[ ] Confirm proper tensioning equipment
[ ] Check all hardware compatibility
[ ] Test before final tensioning
[ ] Document complete as-built drawings
Remember: ADSS ငပမ့စးိဲ်ေကစးိဲ installation succeeds when you respect its unique requirements.